Recreation and Park Commission of East Baton Rouge ParishVisit BREC.org
BRECFiscalTransparency Portal

Making EBR better.

Budget and actuals

Start at the fiscal year and drill down to a single general-ledger account and its posted entries. Figures at each level are SQL totals over every account beneath it, so a parent row always equals the sum of its children rather than only the rows shown. This browser covers expenditure accounts; revenue, asset and liability accounts are not summed into these budget and actual figures, and revenue appears on the home revenue figures instead.

Filter these figures

The filters above are for the flat account list. The drilldown table on this page narrows by clicking a row, and the URL always shows exactly where you are.

Object codes within Information Technology

Object codes within Information Technology: revised budget and expenditure

Which object codes hold the budget, and how much of it has been spent?

See every figure in “Object codes within Information Technology: revised budget and expenditure” as a table
Object codes within Information Technology: revised budget and expenditure: 1 categories, 2 measures. Source: Publication #2619, data through 2026-11-17. Revised budget is the sum of this group's account-level revised budgets..
Object codeRevised budgetExpenditureOpen
000 — No Division$0.00-$49,151.00Open

Nodes: 1 · Accounts: 1 · Entry Count: 5

Publication #2619, data through 2026-11-17. Revised budget is the sum of this group's account-level revised budgets.How this figure is computed

Object codes in fiscal year 2026, ranked by budget size. Totals below are over all 1 item at this level.
Object codeOriginal budgetRevised budgetExpenditureUtilisationAvailableAccountsEntriesNext level
000 — No Division$0.00$0.00-$49,151.00Not applicableNot applicable1 account5 entrysDrill down
Total at this level$0.00$0.00-$49,151.00——1 account5 entrys

How to read these figures

  • Utilisation is expenditure ÷ revised budget, shown only when the revised budget is greater than zero. A zero or negative budget is labelled, never shown as a percentage.
  • Available = revised − expenditure − encumbrance − requisition reservations.
  • A parent figure covers every account beneath it, including ones not shown because the list is capped; the row counts state the population. Revised budget at every level is the sum of the revised budgets of the accounts inside it (per-account sum).
  • Unassigned means the ledger code is blank in that segment for the accounts concerned — it is a real grouping, not an error to be summed away.