Recreation and Park Commission of East Baton Rouge ParishVisit BREC.org
BRECFiscalTransparency Portal

Making EBR better.

Budget and actuals

Start at the fiscal year and drill down to a single general-ledger account and its posted entries. Figures at each level are SQL totals over every account beneath it, so a parent row always equals the sum of its children rather than only the rows shown. This browser covers expenditure accounts; revenue, asset and liability accounts are not summed into these budget and actual figures, and revenue appears on the home revenue figures instead.

Filter these figures

The filters above are for the flat account list. The drilldown table on this page narrows by clicking a row, and the URL always shows exactly where you are.

GL accounts within Golf Development

GL accounts within Golf Development: revised budget and expenditure

Which gl accounts hold the budget, and how much of it has been spent?

See every figure in “GL accounts within Golf Development: revised budget and expenditure” as a table
GL accounts within Golf Development: revised budget and expenditure: 13 categories, 2 measures. Source: Publication #2744, data through 2026-11-18. Revised budget is the sum of this group's account-level revised budgets..
GL accountRevised budgetExpenditureOpen
416201 — 416201$88,826.63$90,368.39Open
426301 — 426301$34,162.68$0.00Open
426302 — 426302$0.00$24,036.80Open
416211 — 416211$10,891.76$3,579.00Open
517221 — 517221$2,000.00$0.00Open
426308 — 426308$1,445.91$1,210.79Open
466711 — 466711$1,000.00$1,215.08Open
426303 — 426303$0.00$1,023.27Open
426306 — 426306$675.28$221.89Open
446502 — 446502$399.99$655.75Open
476805 — 476805$600.00$515.17Open
476808 — 476808$600.00$274.29Open
All other gl accounts at this level$1,514.92$1,278.35Open

Nodes: 18 · Accounts: 14 · Entry Count: 139

Publication #2744, data through 2026-11-18. Revised budget is the sum of this group's account-level revised budgets.How this figure is computed

GL accounts in fiscal year 2023, ranked by budget size. Totals below are over all 18 items at this level.
GL accountOriginal budgetRevised budgetExpenditureUtilisationAvailableAccountsEntriesNext level
416201 — 416201$88,826.63$88,826.63$90,368.39101.7%-$1,541.761 account28 entrysDrill down
426301 — 426301$34,162.68$34,162.68$0.000.0%$34,162.680 accounts0 entrysDrill down
426302 — 426302$0.00$0.00$24,036.80Not applicableNot applicable1 account28 entrysDrill down
416211 — 416211$10,891.76$10,891.76$3,579.0032.9%$7,312.761 account5 entrysDrill down
517221 — 517221$2,000.00$2,000.00$0.000.0%$2,000.000 accounts0 entrysDrill down
426308 — 426308$1,445.91$1,445.91$1,210.7983.7%$235.121 account28 entrysDrill down
466711 — 466711$1,000.00$1,000.00$1,215.08121.5%-$215.081 account4 entrysDrill down
426303 — 426303$0.00$0.00$1,023.27Not applicableNot applicable1 account7 entrysDrill down
426306 — 426306$675.28$675.28$221.8932.9%$453.391 account5 entrysDrill down
446502 — 446502$399.99$399.99$655.75163.9%-$255.761 account9 entrysDrill down
476805 — 476805$600.00$600.00$515.1785.9%$84.831 account9 entrysDrill down
476808 — 476808$600.00$600.00$274.2945.7%$325.711 account1 entryDrill down
507109 — 507109$600.00$600.00$540.3690.1%$59.641 account12 entrysDrill down
456601 — 456601$525.00$525.00$502.0095.6%$23.001 account1 entryDrill down
466701 — 466701$249.96$249.96$25.9910.4%$223.971 account1 entryDrill down
527319 — 527319$0.00$0.00$210.00Not applicableNot applicable1 account1 entryDrill down
517203 — 517203$100.00$100.00$0.000.0%$100.000 accounts0 entrysDrill down
517207 — 517207$39.96$39.96$0.000.0%$39.960 accounts0 entrysDrill down
Total at this level$142,117.17$142,117.17$124,378.7887.5%$17,738.3914 accounts139 entrys

How to read these figures

  • Utilisation is expenditure ÷ revised budget, shown only when the revised budget is greater than zero. A zero or negative budget is labelled, never shown as a percentage.
  • Available = revised − expenditure − encumbrance − requisition reservations.
  • A parent figure covers every account beneath it, including ones not shown because the list is capped; the row counts state the population. Revised budget at every level is the sum of the revised budgets of the accounts inside it (per-account sum).
  • Unassigned means the ledger code is blank in that segment for the accounts concerned — it is a real grouping, not an error to be summed away.